Redesign of the intersections at 53rd Street and at Bryn Mawr Avenue along Parkside Avenue to improve traffic safety for all road users. Current project status: Construction

Jump to:

Overview

Notice: Construction begins Monday, July 20, 2026 and includes daytime road closures. See the additional details section for more information.

This project redesigns Parkside Avenue’s intersection at 53rd Street and at Bryn Mawr Avenue to improve traffic safety for everyone, whether they are walking, biking, or driving. The new intersection designs will shorten crosswalk distances, slow down turning drivers, improve accessibility, and provide clearer instructions to all roadway users.

This project includes:

  • New intersection designs with concrete sidewalk bump outs that will improve traffic safety by shortening crosswalk distances and slowing down turning drivers.
  • New stormwater drainage inlets
  • New ADA-compliant sidewalk curb and bike ramps
  • High-visibility crosswalks and roadway traffic markings
  • New traffic signals, including Accessible Pedestrian Signal (APS) buttons and countdown timers.
  • New separated two-way bike facility that becomes sidewalk level at each intersection’s concrete bump-outs.

If you have questions, please email streets@phila.gov.


Timeline

Current project status: Construction
1
Planning: 2019 through 2022
2
Design: 2022 through 2025
3
Construction: Summer 2026 through Fall 2026
4
Complete: Fall 2026

Additional details

Construction notice

Construction begins Monday, July 20, 2026 with full road closures weekdays from 7 a.m. to 3 p.m. The roadway will be temporarily restored and fully reopened to traffic every afternoon and all weekend.

Closures will occur one intersection at a time, starting with 53rd Street and Parkside Avenue then switching to Bryn Mawr Avenue and Parkside Avenue. The closures are anticipated to continue for 2 to 3 weeks per intersection (4 to 6 weeks total). Weather and other factors may change the construction timeline.

These closures will enable crews to quickly and safely complete initial construction of the new intersection designs, including new curb lines, temporary traffic markings, and drainage installation. Construction will continue with the roadway open to traffic through this fall.

Local access to the Parkside Evans Recreation Center and nearby facilities will be maintained throughout the project. Mann Center event traffic will not be impacted by the daytime-only road closure hours.

Funding:

  • Pennsylvania Department of Transportation (PennDOT) Multimodal Transportation Fund (MTF) and Automated Red-Light Enforcement (ARLE)
  • City of Philadelphia Vision Zero and Capital Resurfacing and ADA

Project team:

  • Streets Department of Transportation (StreetsDOT)
  • Pennoni
  • JPC Group, Inc.
  • JMT
  • Drive Engineering

Partners:

  • Councilmember Curtis Jones, Jr. (District 4)

Photos

A view of the intersection before construction starts.
The intersection of Parkside Avenue and 53rd Street will be rebuilt with new concrete sidewalk bump-outs and medians, shortening crosswalk distances, raising the bike lane, and slowing turning drivers. (Credit StreetsDOT, July 2026)
A view of the intersection before construction starts.
The intersection of Parkside Avenue and Bryn Mawr will be rebuilt with new concrete sidewalk bump-outs and medians, shortening crosswalk distances, raising the bike lane, and slowing turning drivers. (Credit StreetsDOT, July 2026)

Top