This is the StreetsDOT weekly paving operations schedule. Check for posted “No-Parking” signage on these listed streets for updates on when work will take place.

Jump to see information about:


Scheduled paving work

City paving work scheduled from September 14 to September 20

Paving work is weather-dependent, and the schedule may be subject to change. Always check for posted “No-Parking” signs for the most up-to-date information.

For PennDOT resurfacing work, please visit StreetSmartPHL and select the PavePHL tab.

Street From To Work type
Indiana Ave 25th St 27th St Paving
Indiana Ave 24th St 22nd St Paving
Judson St Cambria St Somerset St Paving
Bonsall St Cambria St Somerset St Paving
Hemberger St Somerset St Lehigh Ave Paving
Croskey St Somerset St Lehigh Ave Paving
Fox St 22nd St Allegheny Ave Paving
Indiana Ave 22nd St 21st St Paving
Indiana Ave 21st St 20th St Paving
Mayfield St 20th St Woodstock St Paving
21st St Allegheny Ave Cambria St Paving
21st St Cambria St Somerset St Paving
Cambria St 20th St 22nd St Paving
Gratz St Somerset St Sedgley Ave Paving
17th St Allegheny Ave Indiana Ave Paving
Lippincott St 17th St Allegheny Ave Paving
Medina St 7th st 8th st Paving
Sheridan st Catherine st Queen st Paving
Hall St 10th St Clifton St Paving
Quince st Lombard st Pine st Paving
Quince st Spruce st Pine st Paving
Wavarly st 12th st Quince st Paving
Wavarly st 11th st Quince st Paving
Latimer Camac 12th Paving
Ionic 8th 7th Paving
St James Quince 11th Paving
Harper 19th 20th Paving
George 19th 20th Paving
Reno 16th 17th Paving
N Burns St Brown st Parrish St Paving
Orkney Fairmont Olive Paving
St John Neumann 3rd st Poplar st/ 5th st Paving
E allen St Sarah Sarah Paving
N van pelt st Cherry st Race st Paving
Burns 16th 17th Paving

What residents need to know

  • Street resurfacing work happens in four phases: Milling, utility adjustments, paving, and line striping. Learn about the paving process.
  • Before Milling work begins, bright orange door hangers are distributed to nearby residents and businesses.
  • Posted “No Parking” signs will list specific dates when road work is expected to occur.
  • Residents should continue checking for updated no-parking signs throughout all four phases of the street resurfacing process.

Relocated vehicles

For information about a vehicle that was relocated due to road work, contact your local Philadelphia Police District.


Upcoming paving work

See a map of all active and planned paving work on StreetSmartPHL under the PavePHL tab.