Paving Program

Paving schedule

This is the StreetsDOT weekly paving operations schedule. Check for posted “No-Parking” signage on these listed streets for updates on when work will take place.

Jump to see information about:


Scheduled paving work

City paving work scheduled from July 13 to July 19

Paving work is weather-dependent, and the schedule may be subject to change. Always check for posted “No-Parking” signs for the most up-to-date information.

For PennDOT resurfacing work, please visit StreetSmartPHL and select the PavePHL tab.

Street From To Work type
63rd St Lindbergh Blvd Dicks Ave Paving
63rd St Dicks Ave Buist Ave Paving
63rd St Buist Ave Elmwood Ave Paving
63rd St Elmwood Ave Grays Ave Paving
63rd St Grays Ave Paschall Ave Paving
63rd St Paschall Ave Woodland Ave Paving
63rd St Woodland Ave Greenway Ave Paving
80th St Lindbergh Blvd Buist Ave Paving
Annapolis Rd Convent Ave Brookdale Rd Paving
Annapolis Rd Brookdale Rd Holyoke Rd Paving
Ashburner St Frankford Ave State Rd Paving
Blue Grass Rd Winchester Ave Woodward St Paving
Blue Grass Rd Woodward St Tremont St Paving
Brous Ave Dewees St Brocklehurst St Paving
Brous Ave Brocklehurst St Lister St Paving
Brous Ave Lister St Winchester Ave Paving
Caesar Pl 80th St cul de sac Paving
Calvert St Tremont St Woodward St Paving
Calvert St Woodward St Winchester Ave Paving
Chelwynde Ave 80th St Caesar Pl Paving
Clayton St Tolbut St Walnut Hill St Paving
Fairfield St Tremont St Woodward St Paving
Fairfield St Woodward St Calvert St Paving
Greenway Ave 63rd St dead end Paving
Hagys Mill Rd Spring Ln Port Royal Ave Milling
Leonard St Fairfield St Tremont St Paving
Lister St Winchester Ave Revere St Paving
Mars Pl Mercury Pl 80th St Paving
Mars Pl 80th St Angelo Pl Paving
Mercury Pl 78th St Mars Pl Paving
N 22nd St Ridge Ave W Dauphin St Milling
N 22nd St W Susquehanna Ave W Lehigh Ave Milling
N 22nd St W Lehigh Ave W Allegheny Ave Milling
N 22nd St W Allegheny Ave W Erie Ave Milling
N 22nd St Ridge Ave W Dauphin St Milling
N 22nd St W Susquehanna Ave W Lehigh Ave Milling
N 22nd St W Lehigh Ave W Allegheny Ave Milling
N 22nd St W Allegheny Ave W Erie Ave Milling
Nester St Welsh Rd Welsh Rd Paving
Phillips Terr Pompey Pl Midis Pl Paving
Pompey Pl 80th St cul de sac Paving
Pompey Pl 80th St Phillips Terr Paving
Red Lion Rd Gantry Rd Bustleton Ave Paving
Revere St Tremont St Woodward St Paving
Revere St Woodward St Winchester Ave Paving
Saturn Pl 78th St cul de sac Paving
Spring Ln Hagys Mill Rd Ridge Ave Milling
Venus Pl 78th St cul de sac Paving
W School House Ln Ridge Ave Wissahickon Ave Milling
W School House Ln Henry Ave Wissahickon Ave Milling
W School House Ln Wissahickon Ave Wayne Ave Milling
W School House Ln Wayne Ave Germantown Ave Milling
Woodenbridge Rd Convent Ave Annapolis Rd Paving
Woodward St Roosevelt Blvd Revere St Paving

What residents need to know

  • Street resurfacing work happens in four phases: Milling, utility adjustments, paving, and line striping. Learn about the paving process.
  • Before Milling work begins, bright orange door hangers are distributed to nearby residents and businesses.
  • Posted “No Parking” signs will list specific dates when road work is expected to occur.
  • Residents should continue checking for updated no-parking signs throughout all four phases of the street resurfacing process.

Relocated vehicles

For information about a vehicle that was relocated due to road work, contact your local Philadelphia Police District.


Upcoming paving work

See a map of all active and planned paving work on StreetSmartPHL under the PavePHL tab.