Street Resurfacing Work – April 13 to April 19

Check for posted parking restriction signage for updates

PHILADELPHIA – The Streets Department will conduct street resurfacing work next week, April 13 to April 19, on the following streets:

Street From To Type of Work
Unruh Ave Castor Ave E Roosevelt Blvd Milling
Magee Ave Castor Ave E Roosevelt Blvd Milling
Longshore Ave Rowland Ave Torresdale Ave Milling
Eastwood St Magee Ave Tyson Ave Milling
Saint Vincent St Castor Ave E Roosevelt Blvd Milling
Longshore Ave Rhawn St Torresdale Ave Milling
Hasbrook Ave Godfrey Ave Devereaux Ave Paving
Hasbrook Ave Devereaux Ave Levick St Paving
Comly St Rising Sun Ave Hasbrook Ave Paving
Howell St Rising Sun Ave Hasbrook Ave Paving
VanKirk St Rising Sun Ave Hasbrook Ave Paving
Alcott St Rising Sun Ave Hasbrook Ave Paving
Kindred St Princeton Ave Tyson Ave Paving
Tyson Ave Roosevelt Blvd Bustleton Ave Paving
Tyson Ave Bustleton Ave Castor Ave Paving
Rutland St Tyson Ave Longshore Ave Paving
Rutland St Longshore Ave Princeton Ave Paving
Rutland St Princeton Ave St. Vincent St Paving
Rutland St St. Vincent St Cottman Ave Paving
Lynford St Cottman Ave Princeton Ave Paving
Lynford St Princeton Ave Tyson Ave Paving
Lynford St Tyson Ave Longshore Ave Paving

 

This work will happen in four phases: Milling, Utility Adjustments, Resurfacing, and Line Striping. Phase one, crews milling the roadway will remove the old asphalt surface. Phase two, additional prep work such as adjustments to utility access and manhole covers is conducted. Phase three, paving crews will resurface the street. Phase four, line striping crews will paint stop bars, crosswalks, and other lines as designed.

These four phases are completed by different crews on different days. Please pay attention to posted signage for updates on when work will occur and parking will be restricted. If your vehicle is relocated, check nearby streets or contact your local police district. A map of police districts can be found online at: www.phillypolice.com/district

 

###