Work begins on the conceptual design report, including a pop-up event at the Olney Transportation Center. Transit riders give input on the design ideas.
The conceptual design report is published.
The design phase begins. Initial canvassing and outreach to neighbors takes place. A walking audit of the area is held with stakeholders from RCOs and schools.
Design and engineering work begins. A parking study is conducted.
The project enters the beginning stages of engineering design. A draft of the design is shared with community members via a public event, canvassing, transit rider outreach, and through RCOs.
The draft of the design is revised and finalized. The City continues to seek funding for the next phases of design and construction.