The project team begins community engagement to better understand the traffic safety issues this project can address.
The project team develops draft design ideas for the street, informed by community feedback. The ideas are shared for community feedback.
The project team makes updates to the design ideas to reflect community feedback from Summer 2025. The final draft design for the street is shared again with the community for a last round of feedback.
Preliminary engineering designs are developed between 2026 and 2027.
Final designs are developed between 2028 and 2029.
The project is constructed.