Germantown Avenue complete streets project


A Complete Streets project

Germantown Avenue complete streets project timeline

2025

Spring 2025

The project team begins community engagement to better understand the traffic safety issues this project can address.

Summer 2025

The project team develops a draft design for the street, informed by community feedback. The draft design is shared for community feedback.

Fall 2025

Updates are made to the draft design to reflect community feedback from Summer 2025. An engineering team is identified to develop preliminary engineering design.

2026

Preliminary engineering designs are developed between 2026 and 2027.

2028

Final designs are developed between 2028 and 2029.

2030

The project is constructed.